JURNAL ILMIAH MEDIA ENGINEERING
https://ejournal.unsrat.ac.id/v3/index.php/jime
<p>The Pasca Teknik Sipil (S2) Unsrat Open Journal System (PTSU-OJS) consist of Jurnal Ilmiah Media Engineering (Online Not Yet) and Jurnal Ilmiah Media Engineering (Print) are published fourannualy, in Februari, March, July and November, by Pasca Teknik Sipil (S2) Sam Ratulangi University Ter Index di</p><p><strong><a href="https://scholar.google.co.id/citations?user=GJWz19QAAAAJ&hl=id">INDEX GOOGLE SCHOLLAR </a></strong></p><p><strong><a href="http://sinta2.ristekdikti.go.id/index.php?action=search&ref=journal&search=Jurnal+Ilmiah+Media+Engineering&button2=search+journal%2Fbook">INDEX SINTA (SCIENCE & TECHNOLOGY INDEX) INDONESIA</a></strong></p><p><strong><a title="Indonesia Publication Index" href="http://id.portalgaruda.org/?ref=browse&mod=viewjournal&journal=1017" target="_blank">INDONESIA PUBLICATION INDEX (IPI) PORTAL GARUDA</a></strong></p><p><strong>PTSU-OJS aims to:</strong></p><ol><li>Promote a civil engineering incorporating viewpoints of different disciplines.</li><li>Elaborate and strengthen academic exchange with other institutions.</li><li>Support scientist, practicing engineers, and others to conduct research and other similar activities.</li></ol><p>PTSU-OJS welcomes papers with the above aims and scopes. The editorial board decides papers to be published in PTSU-OJS journal after review by reviewers appointed by the board. Authors will be advised of reviewers' comments and suggestions.</p><p><strong>Submission and Correspondence </strong><br />Author shall submit paper by email to fabian_jm@unsrat.ac.id. File shall be named as follows: first three letters shall be followed by the first name of the first author and first word of the title, i.e.: ptsu-ojs(o/p)-fabian-composite. (o for online and p for print<br /><br />Papers and all correspondences should be addressed to:<br />The Editor, Media Engineering Journal.<br />Pasca Sarjana Teknik Sipil (S2) Sam Ratulangi University<br />Jl. Kampus Unsrat Bahu Manado<br />Tel. <span id="skype_c2c_container" class="skype_c2c_container notranslate" dir="ltr"><span class="skype_c2c_highlighting_inactive_common" dir="ltr"><span id="non_free_num_ui" class="skype_c2c_textarea_span"><img class="skype_c2c_logo_img" src="resource://skype_ff_extension-at-jetpack/skype_ff_extension/data/call_skype_logo.png" alt="" width="0" height="0" /><span class="skype_c2c_text_span">+62-431-852-959</span></span></span></span><br />Fax.+62-31-823-705<br />E-mail: fabian_jm@unsrat.ac.id <br /><br />Manuscripts should be typed double spaced (12-pitch font size, times new roman) in a single column format on A4 size paper with 2.5-cm wide margin (top, bottom, left, right). The length of a manuscript should be limited to maximum of 20 pages total (references, figures, tables, appendices, etc. inclusive). All pages should be numbered consecutively.</p><p><strong><em>Deadline of submission:</em></strong></p><p><strong><em>February edition : first week of December</em></strong></p><p><strong><em>March edition : first week of February<br /></em></strong></p><p><strong><em>July edition : first week of April</em></strong></p><p><strong><em>November edition : first week of August</em></strong></p>Sam Ratulangi Universityen-USJURNAL ILMIAH MEDIA ENGINEERING2087-9334<ol><li>I declare that this paper ... (title of paper) ... is original and has not been published previously nor under consideration to be published elsewhere and that any necessary permission to quote from another source has been obtained.</li><li>With the publication, I transfer the copyright to The Jurnal Ilmiah Media Engineering (PTSU-OJS). This copyright transfer shall cover the exclusive right to reproduce and distribute the article, including reprint, photographic reproduction of similar nature and translation. It shall also include the right to adapt the article for use in conjunction with computer system and programs including reproduction or publication in machine-readable form and incorporation in retrieval systems.</li></ol><p>Author (also on behalf of any co-authors):<br /><br />Signed<br />____________________ <br /><br />Name :<br />Date :</p>Metode Pelaksanaan Pekerjaan Pondasi Bored Pilepada Gedung Rumah Susun Kejaksaan Tinggi II Sulawesi Utara di Manado
https://ejournal.unsrat.ac.id/v3/index.php/jime/article/view/61203
<p>Pondasi <em>bored pile</em> merupakan salah satu jenis pondasi dalam yang banyak digunakan pada proyek pembangunan gedung bertingkat, terutama di daerah dengan kondisi tanah yang daya dukungnya rendah, Pada proyek pembangunan Rumah Susun Kejaksaan Tinggi II Sulawesi Utara di Manado, berdasarkan hasil analisis kondisi tanah ditetapkan pondasi dalam jenis <em>bored pile</em> yang digunakan untuk mendukung struktur bangunan rumah susun di atasnya. Pengumpulan data primer maupun sekunder dilakukan melalui wawancara dengan kontraktor dan penyedia jasa proyek terkait pelaksanaan pekerjaan pondasi tersebut. Dari hasil pengamatan lapangan ditemukan bahwa pekerjaan pembuatan pondasi bored pile menggunakan metode <em>wash boring </em>(bor basah) dengan <em>temoporary casing</em>. Pelaksanaan pada pekerjaan ini dimulai dengan tahap penentuan titik bor pondasi, tahap persiapan, tahap pembersihan lokasi pekerjaan, tahap survey lapangan dan penentuan titik pondasi, tahap instalasi alat bor. Kemudian dilanjutkan secara berturut-turut dengan tahap pemasangan <em>casing</em>, pengeboran lubang pondasi, pabrikasi tulangan, pemasukkan rangka tulangan, pengujian <em>slum test</em> untuk adukan betonnya. Selanjutnya tahap perakitan pipa <em>trime</em> dan pembuatan jalur pengecoran, pemasangan pipa <em>trime</em>. Terakhir yaitu tahap pengecoran, tahap pengangkatan casing dan tahap pembersihan lokasi <em>bored pile</em>. Proses ini membutuhkan pengawasan manajemen konstruksi untuk mengontrol dan memastikan kualitas material yang digunakan, teknik pelaksanaan pekerjaan yang tepat dan keamanan kerja yang terjamin pada setiap tahap pelaksanaannya. Pada pekerjaan pondasi bored pile gedung Rumah Susun Kejaksaan Tinggi II Sulawesi Utara di Manado, tahapan-tahapan pelaksanaan pekerjaan yang dilakukan, sudah mengikuti prosedur pekerjaan yang ada serta faktor-faktor yang memperhambat dalam pekerjaan pondasi bored pile bisa langsung di atasi oleh kontraktor dan manajemen konstruksi proyek.</p>Franscisco RorimpandeyFebrina SumantiJeremias Tjakra
Copyright (c) 2025 Franscisco Rorimpandey, Febrina Sumanti, Jeremias Tjakra
https://creativecommons.org/licenses/by-sa/4.0
2025-03-242025-03-24143