Respon Ionosfer Terhadap Badai Matahari Berdasarkan Analisis Kandungan Elektron Total dan Indeks Gangguan Geomagnet

Authors

  • Arwildo Fianli Belekubun FMIPA Universitas Sam Ratulangi
  • Seni Herlina Juwita Tongkukut FMIPA_ Universitas Sam Ratulangi
  • Asnawi Asnawi LAPAN
  • Dolfie Paulus Pandara FMIPA_Universitas Sam Ratulangi

DOI:

https://doi.org/10.35799/jmuo.8.2.2019.24516

Keywords:

Ionosphere, TEC, DST index

Abstract

Ionosfer merupakan bagian dari lapisan atmosfer bumi yang dinamikanya sangat berpengaruh terhadap sistem komunikasi dan navigasi bumi yang mengandalkan ionosfer sebagai medium rambatan ataupun pantulan. Badai matahari sangat berpengaruh terhadap perubahan parameter-parameter ionosfer. Penelitian ini bertujuan untuk mengevaluasi respon ionosfer Manado terhadap badai matahari bulan Maret 2015. Telah digunakan analisis  jumlah kandungan elektron (TEC, Total Electron Content), dan Indeks gangguan geomagnet (DST, Distributing Storm Time). Hasil penelitian menunjukkan bahwa terjadi penurunan indeks DST sebesar -223nT pada tanggal 18 Maret 2015 yang dilanjutkan oleh penurunan TEC sebesar 20,85 TECU dua jam setelahnya. Proses pemulihan Indeks DST sebanding dengan proses pemulihan TEC yakni 5 hari mulai dari tanggal 18–23 Maret 2015.

The ionosphere is part of the layer of the Earth's atmosphere whose dynamics are very influential on the earth's communication and navigation systems that rely on the ionosphere as a propagation medium or reflection. Solar storms greatly influence changes in ionospheric parameters. This study aims to evaluate Manado's ionospheric response to solar storms in March 2015.This research is using the analysis of the amount of electron content (TEC, Total Electron Content) and geomagnetic interference index (DST, Distributing Storm Time). The results showed that there was a decrease in the DST index of -223nT on March 18, 2015, which was followed by a decrease in TEC of 20.85 TECU two hours later. The recovery process of the DST Index is comparable to the TEC recovery process, which is 5 days from March 18-23 2015

Downloads

Published

25-07-2019

Issue

Section

Articles