[1]
Anthony, J., Arungpadang, T.A. and Punuhsingon, C.S.C. 2024. PENERAPAN RELIABILITY CENTERED MAINTENANCE PADA PERENCANAAN WAKTU INTERVAL PREVENTIVE MAINTENANCE UNIT CONTAINER CRANE DI TERMINAL PETI KEMAS PT PELINDO IV BITUNG. Jurnal Tekno Mesin. 10, 1 (Jun. 2024), 22–29. DOI:https://doi.org/10.35793/jtm.v10i1.51994.