(1)
Anthony, J.; Arungpadang, T. A.; Punuhsingon, C. S. C. PENERAPAN RELIABILITY CENTERED MAINTENANCE PADA PERENCANAAN WAKTU INTERVAL PREVENTIVE MAINTENANCE UNIT CONTAINER CRANE DI TERMINAL PETI KEMAS PT PELINDO IV BITUNG. JTM 2024, 10, 22-29.