Anthony, J., Arungpadang, T. A., & Punuhsingon, C. S. C. (2024). PENERAPAN RELIABILITY CENTERED MAINTENANCE PADA PERENCANAAN WAKTU INTERVAL PREVENTIVE MAINTENANCE UNIT CONTAINER CRANE DI TERMINAL PETI KEMAS PT PELINDO IV BITUNG. Jurnal Tekno Mesin, 10(1), 22–29. https://doi.org/10.35793/jtm.v10i1.51994