ojs2 has produced an error Message: WARNING: unlink(/home/webserv/ejournal-web/cache/fc-pluginSettings-36-objectsforreviewplugin.php): No such file or directory In file: /home/webserv/ejournal-web/lib/pkp/classes/cache/FileCache.inc.php At line: 57 Stacktrace: File: (unknown) line (unknown) Function: PKPApplication->errorHandler(2, "unlink(/home/webserv/ejournal-web/cache/fc-pluginSettings-36-objectsforreviewplugin.php): No such file or directory", "/home/webserv/ejournal-web/lib/pkp/classes/cache/FileCache.inc.php", 57, Array(0)) File: /home/webserv/ejournal-web/lib/pkp/classes/cache/FileCache.inc.php line 57 Function: unlink("/home/webserv/ejournal-web/cache/fc-pluginSettings-36-objectsforreviewplugin.php") File: /home/webserv/ejournal-web/lib/pkp/classes/cache/FileCache.inc.php line 78 Function: FileCache->flush() File: /home/webserv/ejournal-web/classes/plugins/PluginSettingsDAO.inc.php line 59 Function: FileCache->setCache("enabled", Null) File: (unknown) line (unknown) Function: PluginSettingsDAO->_cacheMiss(Object(FileCache), "enabled") File: /home/webserv/ejournal-web/lib/pkp/classes/cache/GenericCache.inc.php line 63 Function: call_user_func_array(Array(2), Array(2)) File: /home/webserv/ejournal-web/classes/plugins/PluginSettingsDAO.inc.php line 50 Function: GenericCache->get("enabled") File: (unknown) line (unknown) Function: PluginSettingsDAO->getSetting("36", "objectsforreviewplugin", "enabled") File: /home/webserv/ejournal-web/lib/pkp/classes/plugins/PKPPlugin.inc.php line 376 Function: call_user_func_array(Array(2), Array(3)) File: /home/webserv/ejournal-web/lib/pkp/classes/plugins/LazyLoadPlugin.inc.php line 69 Function: PKPPlugin->getContextSpecificSetting(Array(1), "enabled") File: /home/webserv/ejournal-web/plugins/generic/objectsForReview/ObjectsForReviewPlugin.inc.php line 57 Function: LazyLoadPlugin->getEnabled() File: /home/webserv/ejournal-web/lib/pkp/classes/plugins/PluginRegistry.inc.php line 66 Function: ObjectsForReviewPlugin->register("generic", "plugins/generic/objectsForReview") File: /home/webserv/ejournal-web/lib/pkp/classes/plugins/PluginRegistry.inc.php line 137 Function: PluginRegistry->register("generic", Object(ObjectsForReviewPlugin), "plugins/generic/objectsForReview") File: /home/webserv/ejournal-web/lib/pkp/classes/core/Dispatcher.inc.php line 132 Function: PluginRegistry->loadCategory("generic", True) File: /home/webserv/ejournal-web/lib/pkp/classes/core/PKPApplication.inc.php line 178 Function: Dispatcher->dispatch(Object(Request)) File: /home/webserv/ejournal-web/index.php line 64 Function: PKPApplication->execute() Server info: OS: Linux PHP Version: 5.5.38 Apache Version: N/A DB Driver: mysql DB server version: 5.5.62-log
OPTIMASI BIAYA DISTRIBUSI MATERIAL DENGAN METODE NWC (NORTH WEST CORNER) (STUDI KASUS : PEMBANGUNAN GEDUNG LABORATORIUM FAKULTAS TEKNIK UNIVERSITAS SAM RATULANGI) | Imbang | JURNAL SIPIL STATIK

OPTIMASI BIAYA DISTRIBUSI MATERIAL DENGAN METODE NWC (NORTH WEST CORNER) (STUDI KASUS : PEMBANGUNAN GEDUNG LABORATORIUM FAKULTAS TEKNIK UNIVERSITAS SAM RATULANGI)

Presianto Paulus Imbang, Pingkan A. K. Pratasis, Deane R. O. Walangitan

Abstract


Proses pendistribusian material merupakan salah satu aspek yang sangat penting untuk direncanakan, karena akan sangat berpengaruh terhadap efisiensi biaya proyek secara keseluruhan. Meningkatnya biaya proyek seringkali diakibatkan oleh proses pendistribusian material yang tidak optimal. Hal ini dapat terjadi terutama jika pekerjaan yang sedang ditangani terdiri dari beberapa proyek yang membutuhkan material dalam jumlah yang besar, dimana satu lokasi pengambilan material saja tidak akan mampu untuk mencukupi seluruh kebutuhan yang ada.

Perbedaan jarak antara sejumlah sumber dengan lokasi-lokasi proyek yang ada ditambah perbedaan harga material di setiap sumber menyebabkan pihak pelaksana proyek harus menentukan suatu cara untuk mendapatkan material yang dibutuhkan dengan biaya distribusi minimum. Untuk itu diperlukan adanya metode yang dapat mengoptimalkan biaya distribusi material dari pemasalahan ini, seperti Metode North West Corner.

Dari hasil pengolahan data menunjukkan bahwa dengan menggunakan Metode North West Corner, pada kasus yang ditinjau, didapatkan biaya distribusi bahan material untuk Semen sebesar Rp. 2.146.155.000,00; Pasir sebesar Rp. 123.331.214,20; dan Kerikil sebesar Rp. 698.879.141,20.

 

Kata kunci: Optimasi, efisiensi, biaya, distribusi, material, proyek, Metode North West Corner

Full Text:

PDF