ANALISIS RISIKO FAKTOR-FAKTOR NON EXCUSABLE PADA TAHAP PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN DI KOTA MANADO
Abstract
The delay caused by non-excusable factors leads to a change in performance that is entirely the responsibility of the contractor. The purpose of this study is to identify, analyze and develop risk response on the non-excusable dominant risk factors that affect the project performance. The target of the respondent is the contractor that have worked on the housing development project “X†in the city of Manado.
              The results of the study were analyzed by using Analytic Hierarchy Process (AHP) method; the non-excusable factors which had the dominant risk to the project change were labor shortage, unreliable subcontractor, labor absenteeism, inefficient communications related to material ordering, and inappropriate scheduling implementation. The risk responses taken are appropriate planning, good communication and coordination, and supervision and control in every stage of the project implementation process.
Â
Keywords: Risk, Non Excusable, Analytic Hierarchy Process (AHP).
Downloads
Published
Issue
Section
License
- I declare that this paper ... (title of paper) ... is original and has not been published previously nor under consideration to be published elsewhere and that any necessary permission to quote from another source has been obtained.
- With the publication, I transfer the copyright to The Jurnal Ilmiah Media Engineering (PTSU-OJS). This copyright transfer shall cover the exclusive right to reproduce and distribute the article, including reprint, photographic reproduction of similar nature and translation. It shall also include the right to adapt the article for use in conjunction with computer system and programs including reproduction or publication in machine-readable form and incorporation in retrieval systems.
Author (also on behalf of any co-authors):
Signed
____________________Â
Name :
Date :