Minimize Rental Costs on Flowshop Scheduling

Authors

  • M Faudzi Bahari Master Program in Mathematics, Faculty of Mathematics and Natural Sciences, Padjadjaran University, Bandung
  • Sudrajat Sudrajat Department of Mathematics, Faculty of Mathematics and Natural Sciences, Padjadjaran University, Bandung
  • E Lesmana Department of Mathematics, Faculty of Mathematics and Natural Sciences, Padjadjaran University, Bandung

DOI:

https://doi.org/10.35799/jis.20.2.2020.27765

Abstract

This paper discusses solving the problem of rental costs in a Flowshop scheduling with n-jobs and m-Machines in small and medium-sized companies to minimize rental costs to be paid. The proposed method is the development of an existing method using several proven propositions. The method used is applied in a sandals company that rents 11 machines used to produce 6 types of products. The proposed method yields a rental fee of IDR 1,071,121.5.

Keywords: Flow shop; minimize rental cost; scheduling

 Minimisasi Biaya Sewa pada Penjadwalan Flowshop

ABSTRAK

Paper ini membahas mengenai minimisasi biaya sewa yang harus dibayar oleh perusahaan berskala kecil-menengah yang menggunakan penjadwalan flowshop dengan n-buah pekerjaan yang dikerjakan oleh m-buah mesin pada proses produksinya. Metode yang dibuat adalah pengembangan dari metode sebelumnya yang  dibuktikan dengan menggunakan beberapa proposisi pendukung. Metode ini telah diaplikasikan pada sebuah perusahaan sandal yang memproduksi 6 jenis sandal dengan menggunakan 11 mesin yang berbeda. Berdasarkan metode ini perusahaan harus membayar biaya sewa mesin sebesar Rp. 1,071,121.5.

Kata Kunci: Flow shop; minimisasi biaya sewa; penjadwalan

Author Biography

M Faudzi Bahari, Master Program in Mathematics, Faculty of Mathematics and Natural Sciences, Padjadjaran University, Bandung


References

Gupta, D. & P. Sehga. 2014. Unavailability in nx2 Flow Shop Scheduling To Minimize Rental Cost With Job-Block Criteria. International Journal of Advanced Research in Science, Engineering and Technology, 6975-6981.

Gupta, D., P. Singla & S. Bala. 2013. Minimize the rental cost in two stage flow shop scheduling problem in which setup time separated from processing time with branch and bound technique. International Journal of Emerging Technology and Advanced Engineering, 315-320.

Narain, L & P.C. Bagga P.C. 2005. Scheduling problems in rental situation. Bulletin of pure and Applied sciences: Section E. Mathematics and statistics, 24.

Narain, L. 2015. Optimize Renting Times of Machines in Flow-Shop Scheduling. International Journal of Engineering and Applied Sciences (IJEAS), 2(5): 84-88.

Narain, L. 2015a. Minimizing Rental Cost In Three-Machine Flowshop Problems. International Journal of Innovative Research in Computer Science & Technology (IJIRCST), 3(3):39-42.

Ahmad, Q.S., M.H. Khan. 2017. N-Jobs And M-Machines Flowshop Scheduling To Minimize The Rental Cost. International Journal of Technical Research and Applications, Special Issue 42 (AMBALIKA): 88-90.

Johnson, S.M. 1954. Optimal two and three stage production schedule with set up times included. Naval Research Logistic, 1(1):61-64.

Downloads

Published

2020-06-03

How to Cite

Bahari, M. F., Sudrajat, S., & Lesmana, E. (2020). Minimize Rental Costs on Flowshop Scheduling. Jurnal Ilmiah Sains, 20(2), 58–63. https://doi.org/10.35799/jis.20.2.2020.27765

Issue

Section

Articles